

Search by job, company or skills

What you'll own
New product introduction
Take builds from EVT through DVT and PVT to ramp. Line and station layout, cycle time balancing, fixture design, and pilot-build FPY at target before we authorise volume.
Process documentation and control
PFMEA, control plans, work instructions, golden samples, FAI sign-off, and periodic audits against the released documents rather than against what the line has drifted into.
Test strategy
Define ICT and FCT jigs with engineering. Test coverage and limits, hipot and earth-continuity setups, BMS and pack functional test, gauge calibration and GR&R.
Incoming quality and lot disposition
AQL sampling plans per ISO 2859 for cells, BMS and adapters. Supplier 8D, scorecards, and the call on whether a lot ships.
What you bring
Skills
New Product Introduction (NPI); Electronics Manufacturing; Surface-Mount Technology (SMT); PFMEA; Quality Control; Supplier Quality; Test Fixtures; Statistical Process Control (SPC); Root Cause Analysis; Design for Manufacturing (DFM)
Job ID: 153473423