
Search by job, company or skills

Principal Accountability/ Key Result Areas | Supporting Actions(Max1325 charactersfor each KRA) | ||
|
Note: Completed basic & detailed engineering of approx.- 1.5GW capacity projects. | ||
|
Note: Completed basic & detailed engineering of approx.- 1.5GW capacity projects. | ||
|
Note: Completed basic & detailed engineering of approx.- 1.5GW capacity projects. | ||
|
Note: Completed basic & detailed engineering of approx.- 1.5GW capacity projects. | ||
|
Note: Completed basic & detailed engineering of approx.- 1.5GW capacity projects. | ||
|
|
For EHV Transmission Line up to 400kV:1. Conductor Selection & Ampacity Calculation Report 2. OPGW & Earth Wire Sizing Report 3. Line Loss & Efficiency Calculation Report 4. Insulator String Design & BIL Report 5. Tower Design & Load Data Report For EHV Substation up to 400kV: 1. Single Line Diagram (SLD) 2. General Arrangement (GA) Drawings 3. Electrical System Calculations Report 4. Equipment GTPs and Datasheet Approvals 5. Statutory & Regulatory Approval Documents | For EHV Transmission Line:1. Document detailing conductor type selection based on load capacity, current rating, and short circuit considerations. 2. Defines the specifications and sizing of Optical Ground Wire and Earth Wire for protection and communication. 3. Calculates line losses under various load conditions to ensure system efficiency and energy evacuation reliability. 4. Specifies insulator types and Basic Insulation Level (BIL) requirements to withstand lightning and switching surges. 5. Provides structural design details, wind load, weight load data, and tower type classification based on site conditions. For EHV Substation: 1. Shows the electrical configuration of the substation, including bus arrangements, breakers, isolators, transformers, and feeder connections for system clarity. 2. Provides the physical layout of equipment like transformers, GIS/AIS bays, control rooms, and cable trenches, ensuring efficient space utilization and safety. 3. Includes earthing system design, lightning protection, battery & charger sizing, cable sizing, and short circuit force calculations to ensure technical robustness. 4. Vendor-submitted technical particulars for major equipment (transformers, breakers, CT/PTs) reviewed and approved for design and procurement assurance. 5. Contains CEIG, CEA, STU, CTU, and grid code compliance approvals required for substation design acceptance and energization. |
Job ID: 145820393